Work has begun on the expansion of the Circle. The plan is to double the size of the current studio by the first of the year. As Builder Hank begins framing in the new walls, Karen was on her hands and knees patching a serious crack in the concrete floor.
Later this month the south wall of the existing studio (the one pictured above) will be removed to create one large, glorious space. Classes will continue at Karen’s art studio, located in the historic residential district at the corner of Third and Avenue B — it’s the pink church!
“We will need a little prayer (along with the small business loan from Columbia bank) to pull this off,” said Karen, holding tight a tub of concrete patching mix.